icon of a paper next to Apply online text
open door next to gray writing "Visit"
Small icon next to white bg says "Give"
plus sign and gray writing

Past Conference Proceedings

 

1984

1992

1985

1993

1986

1994

1987

1995

1988

1996

1989

1997

1990

1998

1991

1999

 (1999)

  1. Gunasekaran, A., Miele, R. and Rahimi, F., "Investment Justification of Information Technology Projects: A Case Study", Proceedings of the 15th International Conference on Production Research, University of Limerick, Limerick, Ireland, August 9-12, 1999 (Edited by M.T. Hillery and H.J. Lewis), Vol. 1, pp. 695-698.  
  2. Gunasekaran, A., McNeil, R. and Ajasa, T., "Implementation of Cellular Manufacturing in Small and Medium Enterprises: A Case Study", Proceedings of the 15th International Conference on Production Research, University of Limerick, Limerick, Ireland, August 9-12, 1999 (Edited by M.T. Hillery and H.J. Lewis), Vol. 2, pp. 1561-1564.
  3. Marri, H.B., Gunasekaran, A. and Grieve, R.J., "Performance Measurement in the Implementation of CIM in Small and Medium Enterprises: An Empirical Analysis", Proceedings of the 15th International Conference on Production Research, University of Limerick, Limerick, Ireland, August 9-12, 1999 (Edited by M.T. Hillery and H.J. Lewis), Vol. 2, pp. 1865-1868.

(1998)

  1. Marri, H.B., Gunasekaran, A. and Grieve, R.J., "A Framework for the Implementation of Computer-Integrated Manufacturing in Small and Medium Enterprises", Proceedings of the 14th National Conference on Manufacturing Research, Derby, England, September 7-9, 1998 (Edited by R.W. Bains, A. TalebBendiab and Z. Zhao), Advances in Manufacturing Technology XII, Ch. 114, pp. 151-156.  
  2. Mousavi, A., Adl, P., Gunasekaran, A. and Rakowski, R., "An Integrated Marketing and Product Design Model for Reducing Design Cycle time", Engineering Design Conference '98 Proceedings, London, United Kingdom, June 23-25, 1998 (Edited by S. Sivaloganathan and T.M. M. Shahin), Professional Engineering Publishing Ltd., Suffolk, England, Ch. 76, pp. 503-510.

(1997)

  1. Gunasekaran, A. and Cecille, P., "Improving Productivity and Quality in a SME: A Case Study", Proceedings of the Fourteenth Irish Manufacturing Conference, Dublin, Ireland, September 2-5, 1997.   
  2. Gunasekaran, A., "Implementation of Total Quality Management", Proceedings of the 13th National Conference on Manufacturing Research,Glasgow Caledonian University, Glasgow, UK, September 9-11, 1997, pp. 196-200.   
  3. Gunasekaran, A., "An Integrated Product Design and Quality Management System in Manufacturing", Proceedings of the ICQEM - '97 International Conference on Quality Engineering and Management, Coimbatore, India, August 4-6, 1997, (Edited by S. Palaniswami, P. Radhakrishnan and V. Srivatsvan), pp. 589-596.
  4. Gunasekaran, A., "Experiences of Finnish Firms in International and Joint R&D Projects", Proceedings of the Portland International Conference on Management of Engineering Technology, Portland State University, Oregon, USA, July 27-31, 1997, (Edited by D.F. Kocaoglu and T.R. Anderson), Innovation in Technology Management - The Key to Global Leadership, Ch. 499, pp. 546-549.
  5. Gunasekaran, A. and Love, P.E.D., "Agile Construction: An Alternative Paradigm for Improving Competitiveness", Proceedings of the Construction Process Reengineering 1997, July 13-15, 1997, Gold Coast, Queensland, Australia (Invited Paper).   
  6. Gunasekaran, A., "Concurrent Engineering: A Competitive Strategy for Process Industry", Proceedings of the First European Conference on Intelligent Systems in Operations, Salford, UK, March 25-26, 1997, pp. 155-162.

(1996)

  1. Love, P. and Gunasekaran, A., "Towards Concurrency and Integration in the Construction Industry", Proceedings of the Third International Conference on Concurrent Engineering, Toronto, Canada, August 26-29, 1996.  
  2. Marri, H.B., Grieve, R.J. and Gunasekaran, A., "Computer-Aided Process Planning (CAPP): A State of Art", Proceedings of the Doctoral Conference, Department of Manufacturing & Engineering Systems, Brunel University, Uxbridge, United Kingdom, June 19-20, 1996, pp. 36/1-36/10.
  3. Gunasekaran, A. and M. Sarhadi "Implementation of Activity-Based Costing in Manufacturing", Proceedings of The Ninth International Working Seminar on Production Economics, Innsbruck, Austria, February 19-23, 1996, pp. 413-433.

(1995)

  1. Gunasekaran, A. and Rahman, S., "An Investigation on the Applications of Multimedia in Manufacturing", Proceedings of the 6th International Conference on Manufacturing Engineering, Melbourne, Australia, November 29- December 1, 1995.  
  2. Gunasekaran, A., Goyal, S.K., Virtanen, I. and Yli-Olli, P., "Group Technology in Manufacturing: A Review", Proceedings of the International Conference on Industrial Engineering and Production Management, Marrakech, Morocco, April 4-7, 1995, pp. 476-484.
  3. Gunasekaran, A., Okko, P., Martikainen, T. and P. Yli-Olli, "Productivity and Quality Improvement in Small and Medium Enterprises", The Fifth International Conference on Productivity & Quality Research (ICPQR-95), Miami, Florida, USA, February 20-24, 1995 (Proceedings edited by D. Sumanth, Productivity and Quality Frontiers V), pp. 382-392.

(1994)

  1. Subba Rao, R., Gunasekaran, A., Goyal, S.K. and Martikainen, T., "Queueing Models in the Design and Operations of Manufacturing Systems",Proceedings of The 45th International Industrial Engineering Conference/Third IERC Research Conference, Atlanta, Georgia, USA, May 15-19, 1994 (Edited by L. Burke and J. Chapman), pp. 623-628.   
  2. Okko, P. and Gunasekaran, A., "An Investigation on the Technology Transfer and Diffusion Processes", Proceedings of the Fourth International Conference on Management of Technology, Miami, Florida, USA, February 28-March 4, 1994, pp. 375-385.

(1993)

  1. Lyu, J. and Gunasekaran, A., "A Simulation Model with Embedded Expert System", Proceedings of the European Simulation Symposium 1993, Delft, The Netherlands, October 25-28, 1993.   
  2. Gunasekaran, A., Virtanen, I. Martikainen, T. and Yli-Olli, P., "The Design of Computer-Integrated Manufacturing Systems", Proceedings of the International Conference on Managing Integrated Manufacturing, Keele, U.K., September 22-24, 1993 (Edited by J.S. Hassard, P.L. Forrester, C. Hawksley and N.K.H. Tang), pp. 541-558.  
  3. Gunasekaran, A. Goyal, S.K., Virtanen, I. and Yli-Olli, P., "Improving Productivity and Quality in Government Institutions Through a Strategic Approach", Proceedings of the Second International Symposium on Productivity and Quality Improvement with a Focus on Government, Washington, D.C., USA, September 8-10, 1993 (Proceedings edited by John S.W. Fargher, Jr.), pp. 372-378. 
  4. Gunasekaran, A., Goyal, S.K., Virtanen, I. and Yli-Olli, P., "Economic Production and Order Quantities for Jointly Replenished Items",Proceedings of the 12th International Conference on Production Research, Lappeenranta, Finland, August 16-20, 1993, pp. 771-772.
  5. Gunasekaran, A., Lyu, J., Virtanen, I. and Yli-Olli, P., "Optimal Inventory Policies in a Class of Production-Inventory Systems", Proceedings of the First International Conference on Global Business Environment and Strategy, Tainan, Taiwan, R.O.C., March 12-15, 1993, pp. 331-337.

(1992)  

  1. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Determining Economics Inventory Policies in a Multi-Stage Just-In-Time Production System", Proceedings of The Seventh International Working Seminar on Production Economics, Innsbruck, Austria, February 17-21, 1992.

(1991)  

  1. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Equipment Selection Problems in Just-In-Time Manufacturing Systems",Proceedings of the OR Research Conference, Salford, United Kingdom, December 19-20, 1991.
  2. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Implementation of Japanese Manufacturing Concepts in Finnish Industry",Proceedings of the NOAS 91 Conference, Turku, Finland, August 22-23, 1991.

(1990)

  1. McTavish, R., Goyal, S. K. and Gunasekaran, A., "Implementation of Zero Inventories and Just-In-Time Production Concepts in Chinese Manufacturing Organizations", Proceedings of the International Canada-China Management Conference, Xylan, China, August 10-14, 1990, (Travel award winning paper), pp. 617-628.

(1985)

  1. Gunasekaran, A., "Study of Turn-Over Rate of a Production System as a Performance Indicator", Proceedings of the 11th IMACS World Congress, Oslo, Norway, 1985.   
  2. Gunasekaran, A., "Identification of the Behaviour of a Production-inventory System Considering the Decay of Material", Proceedings of the 7th IFAC/IFORS Society Symposium on Identification and System Parameter Estimation, University of York, York, England, July 3-7, 1985, Identification and System Parameter Estimation, (Edited by H.A. Barker and P.C. Young), Pergamon Press, Elmsford, NY, Vol. 7, Ch. 328, No. 7, pp. 1113-1117.   
  3. Gunasekaran, A., "The Turn-Over Rate of a Production-inventory System for Varying Number of Products Considering the Decay of Materials", Proceedings of the IFAC/IFORS Conference on Control Science and Technology for Development, Peking, China, 1985.   
  4. Gunasekaran, A., Subash Babu, A. and Ramaswamy, N., "Multi-stage Production-inventory Systems with Multiple Spindles and Batch Blocking- Some Problems in Optimization", Proceedings of the 2nd International Working Conference on Production Economics, Innsbruck, Austria, 1985.   
  5. Gunasekaran, A., "The Effect of Varying Marketing Policies on the Dynamics of a Production-inventory System", Proceedings of the INRIA Conference on Production Systems-Scientific, Economic, Strategic Approach, Paris, France, 1985.   
  6. Gunasekaran, A., "A New Order Starting Time in a Fixed Production Schedule: A Queueing Theory Approach", Proceedings of the International Conference on Mathematical Modelling, Berkeley, CA, USA, 1985.   
  7. Gunasekaran, A., "The Economic Batch Size in a Production System for Changing Marketing Decisions", Proceedings of the 7th European Congress on Operational Research, Bologna, Italy, 1985.   
  8. Gunasekaran, A., Subash Babu, A. and Ramaswamy, N., "An OR Based Study of Multi-Stage Production-Inventory Systems", Proceedings of the Symposium on Systems Improvement through Operational Research/Systems Analysis, New Delhi, India, 1985.

(1984)  

  1. Gunasekaran, A., "A Study of Turn-Over Rate of a Production System Considering the Value of Products", Proceedings of the IFIP Global Modelling Conference, Buenos Aires, Argentina, 1984.   
  2. Gunasekaran, A., "Application of Aggregate Production Planning Models in Developing Countries: An Analysis", Proceedings of the International Seminar on Algorithms for Production Control and Scheduling, Karlovy Vary, Czechoslovakia, 1984.   
  3. Gunasekaran, A., "Optimization of Emergency Order Process-Starting Time in Routine Manufacturing Schedules", Proceedings of the 2nd Latin American Congress on Operational Research and Systems Engineering, Buenos Aires, Argentina, 1984.


QuickLinks

x

myUMassD

x

myCoursesmyCourses myAlertmyAlert LibraryLibrary
COINCOIN HRDirectHR Direct umasspassUMass Pass
ReservItReservIt ZimbraZimbra
+