icon of a paper next to Apply online text
open door next to gray writing "Visit"
Small icon next to white bg says "Give"

Past Journal Articles

1984

1992

1985

1993

1986

1994

1987

1995

1988

1996

1989

1997

1990

1998

1991

1999

(1999)

  1. Susila, B., Gunasekaran, A., Arunachalam, S. and Radhakrishnan, P., "Interfacing Geometric Model Data with Rapid Prototyping Systems", Journal of Intelligent Manufacturing, Vol. 10 (1999), 323-329.    
  2. Li, H., Love, P.E.D. and Gunasekaran, A., "A Conceptual Approach to Modelling the Procurement Process of Construction using Petri-Nets", Journal of Intelligent Manufacturing, Vol. 10 (1999), 347-353.    
  3. Gunasekaran, A., Marri, H.B. and Grieve, R.J., "Justification and Implementation of Activity Based Costing in Small and Medium Enterprises",Logistics Information Management, Vol. 12, No. 5 (1999), 386-394.    
  4. Gunasekaran, A., Marri, H.B. and Menci, F., "Improving the Effectiveness of Warehousing Operations: A case Study", Industrial Management & Data Systems, Vol. 99, No. 8 (1999), 328-339.    
  5. McGaughey, R.E. and Gunasekaran, A., "The Y2K Problem: Manufacturing Inputs at Risk", International Journal of Production Planning and Control, Vol. 10, No. 8 (1999), 796-808.    
  6. Gunasekaran, A. and Goyal, S.K., "Multi-Stage Production System: Modelling and Analysis using Simulation", International Journal of Computer Applications in Technology, Vol. 12, No. 2-5 (1999), 119-130.    
  7. Lyu, J. and Gunasekaran, A., "An Object-Oriented Approach to Model a Just-In-Time Production System", International Journal of Computer Applications in Technology, Vol. 12, No. 2-5 (1999), 199-205.    
  8. Gunasekaran, A., Marri, H.B and Yusuf, Y.Y., "Application of Activity-Based Costing: Some Case Experiences", Managerial Auditing Journal, Vol. 14, No. 6-7 (1999), 286-293.    
  9. Gunasekaran, A. and Singh, D., "Design of an Activity-Based Costing System in SMEs: A Case Study", Computers & Industrial Engineering: An International Journal, Vol. 37 (1999), 413-416.    
  10. Gunasekaran, A., Marri, H.B. and Grieve, R.J., "Activity-Based Costing in Small and Medium Enterprises", Computers & Industrial Engineering: An International Journal, Vol. 37 (1999), 407-411.    
  11. Arunachalam, S., Gunasekaran, A., Ngum, S.M., Gill, K.F. and O' Sullivan, J.M., "Taguchi Controlled Knowledge-based Assistant for Improving Quality of Hollow Cylindrical Sections", International Journal of Advanced Manufacturing Technology, Vol. 15 (1999), 503-508.    
  12. Thoburn, J.G., Arunachalam, S. and Gunasekaran, A., "Difficulties Arising from Dyfunctional Information Systems in Manufacturing SMEs - Case Studies", International Journal of Agile Management Systems, Vol. 1, No. 2 (1999), 116-126.    
  13. Gunasekaran, A., "A Framework for the Design and Audit of an Activity-Based Costing System", Managerial Auditing Journal, Vol. 14, No. 3 (1999), 118-126.    
  14. Yamin, S. and Gunasekaran, A., "Organizational Quality: A Cognitive Approach to Quality Management", TQM Magazine, Vol. 11, No. 3 (1999), 180-187.    
  15. Yamin, S., Gunasekaran, A. and Mandavo, F., "Relationship between Generic Strategies, Competitive Advantage and Organizational Performance: An Empirical Analysis", TECHNOVATION, Vol. 19 (1999), 507-518.    
  16. Gunasekaran, A., "Agile Manufacturing: A Framework for Research and Development", International Journal of Production Economics, Vol. 62 (1999), 87-105.    
  17. Yusuf, Y.Y., Sarhadi, M. and Gunasekaran, A., "Agile Manufacturing: the Drivers, Concepts and Attributes", International Journal of Production Economics, Vol. 62 (1999), 33-43.    
  18. March, I. and Gunasekaran, A., "Business Strategy in New High-Tech Ventures: An Empirical Analysis", Management Decision, Vol. 37, No. 3 and 4 (1999), 222-232.    
  19. Gunasekaran, A. and Love, P.E.D., "Current and Future Directions of Multimedia Technology in Business", International Journal of Information Management, Vol. 19 (1999), 105-120.    
  20. Subrahmanyam, G., Gunasekaran, A., Arunachalam, S. and Radhakrishnan, P., "Development of a Tool Database Management System: A Case Study",International Journal of Advanced Manufacturing Technology, Vol. 15 (1999), 562-565.    
  21. Gunasekaran, A., "Enablers of Total Quality Management in manufacturing: A Case Study", Total Quality Management, Vol. 10, No. 7 (1999), 987-996.    
  22. Arunachalam, S., Gunasekaran, A. and O'Sullivan, J.M., "Analyzing the Process Behaviour of Reaming Process using an Experimental Approach",International Journal of Machine Tools & Manufacture: Design, Research and Application, Vol. 39 (1999), 1311-1325.    
  23. Love, P.E.D. and Gunasekaran, A., "Learning Alliances: A Customer-Supplier Focus for Continuous Improvement in Manufacturing ", Industrial and Commercial Training, Vol. 31, No. 3 (1999), 88-96.    
  24. Gunasekaran, A. and Thevarajah, K., "Implications of Computer-Integrated Manufacturing in Small and Medium Enterprises: An Empirical Investigation", International Journal of Advanced Manufacturing Technology, Vol. 15 (1999), 251-260.    
  25. Yamin, S., Gunasekaran, A. and Mavondo, F., "Innovation Index and its Implications on Organizational Performance: A Study of Australian Manufacturing Companies", International Journal of Technology Management, Vol. 17, No. 5 (1999), 495-503.    
  26. Gunasekaran, A., "Just-in-Time Purchasing: An Investigation for Research and Applications", International Journal of Production Economics, Vol. 59 (1999), 77-84.    
  27. Gunasekaran, A. and Love, P., "A Review of Multimedia Technology in Manufacturing", Computers in Industry: An International Journal, Vol. 38 (1999), 65-76.

(1998)  

  1. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "A Conceptual Framework for the Implementation of Zero Inventory and Just-In-Time Manufacturing Concepts", International Journal of Human Factors in Manufacturing, Vol. 8, No. 1 (1998), 63-78.    
  2. Gunasekaran, A., "An Analysis and Experiences on the Management of International and Joint R&D Projects", Management Decision, Vol. 36, No. 9 and 10 (1998), 669-678.    
  3. Gunasekaran, A. and Love, P.E.D., "Concurrent Engineering: A Multidisciplinary Approach for Construction", Logistics Information Management, Vol. 11, No. 4 and 5 (1998), 295-300.    
  4. Love, P.E.D., Gunasekaran, A. and Li, H., "Improving the Competitiveness of Manufacturing Companies by Continuous Incremental Change", TQM Magazine, Vol. 10, No. 3 (1998), 177-185.    
  5. Hussain, M., Gunasekaran, A. and Laitinen, E., "Management Accounting System in Finnish Service Firms", TECHNOVATION - The International Journal of Technology Management, Vol. 18, No. 1 (1998), 57-67.    
  6. Gunasekaran, A., "Agile Manufacturing: Enablers and an Implementation Framework" International Journal of Production Research, Vol. 36, No. 5 (1998), 1223-1247.    
  7. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Production Capacity Planning and Control in Multi-Stage Manufacturing", Journal of Operational Research Society, Vol. 49 (1998), 625-634.    
  8. Gunasekaran, A. and Cecille, P., "Implementation of Productivity Improvement Strategies in a Small Company", TECHNOVATION - The International Journal of Technology Management, Vol. 18, No. 5 (1998), 311-320.    
  9. Marri, H.B., Gunasekaran, A. and Grieve, R.J., "An Investigation into the Implementation of Computer-Integrated Manufacturing in Small and Medium Enterprises", International Journal of Advanced Manufacturing Technology, Vol. 14 (1998), 935-942.    
  10. Gunasekaran, A., "Concurrent Engineering: A Competitive Strategy for Process Industries", Journal of Operational Research Society, Vol. 49 (1998), 758-765.    
  11. Love, P.E.D., Gunasekaran, A. and H. Li, "Putting an Engine into Re-engineering: Towards a Process Oriented Organization", International Journal of Operations & Production Management, Vol. 18, No. 9/10 (1998), 937-949.    
  12. Marri, H.B., Gunasekaran, A. and Grieve, R.J., "Computer-Aided Process Planning - A State of Art ", International Journal of Advanced Manufacturing Technology, Vol. 14 (1998), 261-268.    
  13. Perkins, D. and Gunasekaran, A., "Improving the Effectiveness of a Purchasing System in a Small Company: A Case Study", International Journal of Production Planning & Control, Vol. 9, No. 6 (1998), 611-618.    
  14. Love, P.E.D., Gunasekaran, A. and Li, H., "Concurrent Engineering: A Strategy for Procuring Construction Projects", International Journal of Project Management, Vol. 16, No. 6 (1998), 375-383.    
  15. Gunasekaran, A. and Cecille, P., "Experiences of a Small Company in Productivity Improvements", Production and Inventory Management Journal, Vol. 39, No. 2 (1998), 49-54.    
  16. Gunasekaran, A., "An Integrated Product Development-Quality Management System for Manufacturing", TQM Magazine, Vol. 10, No., 2 (1998), 115-123.    
  17. Rao, S., Gunasekaran, A., Goyal, S.K. and Martikainen, T., "Waiting Line Models in Manufacturing", International Journal of Production Economics, Vol. 54 (1998), 1-28.    
  18. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Total Quality Management: A New Perspective for Improving Quality and Productivity", International Journal of Quality & Reliability Management, Vol. 15, No. 8/9 (1998), 947-968.    
  19. Gunasekaran, A. and Sarhadi, M., "Implementation of Activity-Based Costing in Manufacturing", International Journal of Production Economics,Vol. 56-57 (1998), 231-242. 

(1997)   

  1. Gunasekaran, A., "Essentials of International and Joint R&D projects", TECHNOVATION - The International Journal of Technology Management, Vol. 17, No. 11/12 (1997), 637-647.  
  2. Gunasekaran, A. and Lyu, J., "Implementation of JIT in a Small Company: A Case Study", International Journal of Production Planning and Control, Vol. 8, No. 4 (1997), 406-412.  
  3. Jegathesan, J., Gunasekaran, A. and Muthaly, S., "Technology Development and Transfer: Experiences from Malaysia ", International Journal of Technology Management, Vol. 13, No. 2 (1997), 196-214.  
  4. Gunasekaran, A. and Nath, B.N., "The Role of Information Technology in Business Process Reengineering", International Journal of Production Economics, Vol. 50, No. 2, 3 (1997), 91-104.  
  5. Lyu, J.J. and Gunasekaran, A., "An Intelligent Simulation Model to Evaluate Scheduling Strategies of a Steel Company", International Journal of Systems Science, Vol. 28, No. 6 (1997), 611-616.  
  6. Love, P.E.D. and A. Gunasekaran, A., "Process Reengineering: A Review of Enablers", International Journal of Production Economics, Vol. 50, No. 2, 3 (1997), 183-197.  
  7. Love, P.E.D. and A. Gunasekaran, A., "Concurrent Engineering in the Construction Industry", Concurrent Engineering: Research and Applications (CERA) - An International Journal, Vol. 5, No. 2 (1997), 155-162.  
  8. Gunasekaran, A., "Implementation of Computer-Integrated Manufacturing: A Survey of Integration and Adaptability Issues", International Journal of Computer-Integrated Manufacturing, Vol. 10, No. 1-4 (1997), 266-280.  
  9. Yamin, S., Mavondo, F., Gunasekaran, A. and J.C. Sarros, "A Study of Competitive Strategy, Organizational Innovation and Organizational Performance among Australian Manufacturing Companies", International Journal of Production Economics, Vol. 52, (1997), 161-172. 

(1996)  

  1. Gunasekaran, A., Martikainen, T., Virtanen, I. and Yli-Olli, P., "A Conceptual Framework for Managing Congestion in Manufacturing", International Journal of Production Economics, Vol. 45, Nos. 1-3 (1996), 111-120.  
  2. Setala, J. and Gunasekaran, A., "Activity-Based Costing and Management: A Way to Improve the Profitability of Fish Processing Industry", Production & Inventory Management Journal, Vol. 37, No. 4 (1996), 63-69.  
  3. Muthaly, S. and Gunasekaran, A., "The Essential of a Successful Export Strategy for Vietnamese Small and Medium Enterprises", Enterprise Innovation and Change, Vol. 5, No. 4 (1996), 295-306.  
  4. Gunasekaran, A., Okko, P., Martikainen, T. and Yli-Olli, P., "Improving Productivity and quality improvement in small and medium enterprises: Cases and Analysis", International Small Business Journal, Vol. 15, No. 1, Issue No. 5 (1996), 59-72.  
  5. Lyu, J.J., Gunasekaran, A. and Ding, J.H., “Simulated Annealing Algorithms for Solving the Single Machine Early/Tardy Problem", International Journal of Systems Science, Vol. 27, No. 7 (1996), 605-610.  
  6. Okko, P. and Gunasekaran, A., "An Analysis of Technology Transfer and Diffusion as a Part of Growth Strategy", International Journal of Technology Management, Vol. 12, No. 4 (1996), 477-487.  
  7. Gunasekaran, A., Bignall, B. and Rahman, S.M., "Multimedia in Manufacturing", International Journal of Production Planning and Control, Vol. 7, No. 5 (1996), 440-451.  
  8. Martikainen, T., Perttunen, J., Yli-Olli, P. and Gunasekaran, A., "On the Impact of Infrequent Trading on the Systematic Risk Components of the APT",European Journal of Operational Research, Vol. 88 (1996), 23-37.  
  9. Lyu, J., Gunasekaran, A. and J.-H. Ding, "Statistical Analysis of the Impact of Air Pollution on the Quality of Inventory", International Journal of Quality & Reliability Management, Vol. 13, No. 7 (1996), 48-56.  
  10. McTavish, R., Gunasekaran, A., Goyal. S.K. and Yli-Olli, P., "Establishing a Strategic Approach for Productivity Improvement", Integrated Manufacturing SystemsThe International Journal of Manufacturing Technology Management , Vol. 7, No. 4 (1996), 12-21.  

(1995)     

  1. Gunasekaran, A. Goyal, S.K., Virtanen, I. and Yli-Olli, P., "A Model for Integrated Production-packaging Systems", International Journal of Production Planning and Control, Vol. 6, No. 6 (1995), 508-515.  
  2. Goyal, S.K. and Gunasekaran, A., "An Integrated Production-Inventory-Marketing Model for Deteriorating Items", Computers &  Industrial Engineering: An International Journal, Vol. 28, No. 4 (1995), 755-762.  
  3. Gunasekaran, A., Korukonda, A. R., Virtanen, I. and Yli-Olli, P., "Optimal Investment and Lot-sizing Policies for Improved Productivity and Quality",International Journal of Production Research, Vol. 33, No. 1 (1995), 261-278.  
  4. Martikainen, T., Puhalainen, K., Yli-Olli, P. and Gunasekaran, A., "On the Time-series Stability of industry-relative Financial Ratio Patterns",International Journal of Systems Science, Vol. 26, No. 9 (1995), 1701-1713.  
  5. Gunasekaran, A., Lyu, J., Virtanen, I. and Yli-Olli, P., "The Impact of OPT and TPM on the Economic Production Quantity", International Journal of Systems Science, Vol. 26, No. 9 (1995), 1715-1727.  
  6. Lyu, J., Gunasekaran, A. and Kachitvichyanukul, V., "Towards a Portable and Efficient Environment for Parallel Computing", International Journal of Systems Science, Vol. 26, No. 6 (1995), 1333-1341.  
  7. Martikainen, T., Perttunen, J., Yli-Olli, P. and Gunasekaran, A., "Financial Ratio Distributions Irregularities: Implications for Ratio Classifications",European Journal of Operational Research, Vol. 80, No. 1 (1995), 34-44.  
  8. Selladurai, V., Aravindan, P., Ponnambalam, S.G. and Gunasekaran, A., "Dynamic Simulation of Job-shop Manufacturing System for Optimal Performance", International Journal of Operations & Production Management, Vol. 15, No. 7 (1995), 106-120.  
  9. Lyu, J., Gunasekaran, A., Chen, C.Y. and Kao, C., "A Goal Programming Model for the Coal Blending Problem", Computers & Industrial Engineering: An International Journal, Vol. 28, No. 4 (1995), 861-868. 

(1994)    

  1. Martikainen, T., Perttunen, J., Yli-Olli, P. and Gunasekaran, A., "Modelling the Lead-lag Effect between Dual-class Shares: Evidence from Finland ",International Journal of Systems Science, Vol. 25, No. 7 (1994), 1205-1211.  
  2. Martikainen, T., Perttunen, J. and Gunasekaran, A., "A Note on Factor Identification and Return Interval: Evidence from Swedish Markets",International Journal of Finance, Vol. 6, No. 3 (1994), 887-892.  
  3. Goyal, S.K. and Gunasekaran, A., "Determination of Economic Production Quantity in a Multi-Stage Production System", International Journal of Production Planning and Control, Vol. 5, No. 5 (1994), 499-503.  
  4. Gunasekaran, A., Korukonda, A. R., Virtanen, I. and Yli-Olli, P., "Improving Productivity and Quality in Manufacturing Organizations", International Journal of Production Economics, Vol. 36, No. 2 (1994), 169-183.  
  5. Lyu, J., and Gunasekaran, A., "Statistical Analysis of a Portable Parallel Non-linear Programming Algorithm", Statistics and Computing, Vol. 4 (1994), 253-258.  
  6. Martikainen, T., Perttunen, J., Yli-Olli, P. and Gunasekaran, A., "The Impact of Return Interval on Common Factors in Stock Returns: Evidence from a Thin Security Market", Journal of Banking and Finance, Vol. 18, No. 4 (1994), 659-672.  
  7. Martikainen, T. and Gunasekaran, A., "Variation of E/P Ratios: Implications for the E/P Anomaly ", International Journal of Systems Science, Vol. 25, No. 11 (1994), 1899-1909.  
  8. Gunasekaran, A., Goyal, S.K., Virtanen, I. and Yli-Olli, P., "An Investigation into the Application of Group Technology in Advanced Manufacturing Systems", International Journal of Computer Integrated Manufacturing, Vol. 7 (1994), 215-228.  
  9. Gunasekaran, A., Virtanen, I. , Martikainen, T. and Yli-Olli, P., "The Design of Computer-Integrated Manufacturing Systems", International Journal of Production Economics, Vol. 34 (1994), 313-327.  
  10. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Economic Scheduling of a New Order in a Job-Shop Production System",International Journal of Systems Science, Vol. 25, No. 2 (1994), 365-376.  
  11. Goyal, S.K. and Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Discontinuous Optimization in a Multi-stage Batch Production System",International Journal of Systems Science, Vol. 25, No. 4 (1994), 789-802.  
  12. Martikainen, T., Perttunen, J., Yli-Olli, P. and Gunasekaran, A., "On the common factors in restricted and unrestricted shares: Evidence from a partly segmented stock market", Scandinavian Journal of Economics, Vol. 96, No. 1 (1994), 117-123.  

(1993)    

  1. Goyal, S.K., Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Determining Economic Batch Quantities in a Multi-level Manufacturing System",International Journal of Operations & Production Management, Vol. 13, No. 12 (1993), 79-93.  
  2. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli Olli, P., "Modelling and Analysis of Just-In-Time Manufacturing Systems", International Journal of Production Economics, Vol. 32 (1993), 23-37.  
  3. Lyu, J. and Gunasekaran, A., "Design for Quality of a Shipbuilding Industry", International Journal of Quality and Reliability Management, Vol. 10, No. 4 (1993), 57-63.  
  4. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Determining Economic Inventory Policies in a Multi-Stage Just-In-Time Production System", International Journal of Production Economics, Vol. 30-31 (1993), 531-542.  
  5. Lyu, J., Gunasekaran, A. and Ding, C.-H., "Design for Economic Feasibility of an Automation System: Case of a Shipbuilding Company", Computers in Industry: An International Journal, Vol. 22 (1993), 47-52.  
  6. Goyal, S.K., Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Integrating Production and Quality Control Policies: A Survey", European Journal of Operational Research, Vol. 69 (1993), 1-13.  
  7. Lyu, J., and Gunasekaran, A., "Implementation of Advanced Manufacturing Technology through Industry-Government-University Co-operation in Taiwan ", Computers in Industry: An International Journal, Vol. 22 (1993), 187-191.  
  8. Martikainen, T., Yli-Olli, P. and Gunasekaran, A., "Modelling the Time-Series Variation of Earnings Response Coefficients in the Finnish Stock Market", International Journal of Systems Science, Vol. 24, No. 5 (1993), 829-840.  
  9. Lyu, J. and Gunasekaran, A., "Developing a Visual Interactive Simulation Model for Flexible Manufacturing Systems", International Journal of Operations & Production Management, Vol. 13, No. 6 (1993), 59-67.  
  10. Goyal, S.K., Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Design of Optimal Configuration for a Multi-Stage Production System", International Journal of Production Planning and Control, Vol. 4, No. 3 (1993), 239-252.  
  11. Gunasekaran, A., Martikainen, T. and Yli Olli, P., "Modelling the Effect of Demand Variations on the Performance of a Production System",International Journal of Systems Science, Vol. 24, No. 7 (1993), 1349-1362.  
  12. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Equipment Selection Problems in Just-In-Time Manufacturing Systems", Journal of Operational Research Society, Vol. 44, No. 4 (1993), 345-353.  
  13. Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Flexible Manufacturing Systems: An Investigation for Research and Applications", European Journal of Operational Research, Vol. 66 (1993), 1-26.  
  14. Gunasekaran, A., Goyal. S. K., Martikainen, T. and Yli-Olli, P., "Multi-Level Lot-Sizing in a Rayon-yarn Company: A Case Study", European Journal of Operational Research, Vol. 65 (1993), 159-174.  
  15. Gunasekaran, A., Goyal, S.K., Virtanen, I. and Yli-Olli, P., "Production Planning and Control in Automated Manufacturing Systems", International Journal of Production Planning and Control, Vol. 4, No. 1 (1993), 2-16.

(1992)    

  1. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Modelling the Turn-Over Rate of Production System as a Performance Indicator",International Journal of Operations and Production Management, Vol. 12, No. 6 (1992), 44-55.  
  2. Goyal, S.K. and Gunasekaran, A., "Determining the Economic Maintenance Frequency of a Transport Fleet", International Journal of Systems Science, Vol. 23, No. 4 (1992), 655-659.   

(1991)  

  1. Martikainen, T., Yli-Olli, P. and Gunasekaran, A., "Incremental Significance of Pre-Specified Macro-economic Factors in Testing the Arbitrage Pricing Theory: Empirical Evidence with Finnish Data", Applied Financial Economics, Vol. 1 (1991), 139-147.  
  2. Martikainen, T., Yli-Olli, P. and Gunasekaran, A., "The Finnish Stock Market: An Investigation for Empirical Research and Future Research Directions",Finnish Journal of Business Economics, Vol. 4 (1991), 253-284.  
  3. Gunasekaran, A., Goyal, S. K., Subash Babu, A. and Ramaswamy, N., "Effect of Machine Failures in a Multi-stage Multi-facility and Multi-product Production-inventory System", International Journal of Systems Science, Vol. 22, No. 2 (1991), 273-291.  
  4. McTavish, R., Goyal, S.K. and Gunasekaran, A., "Implementation of Zero Inventories and Just-In-Time Production Concepts in Chinese Manufacturing Organizations", International Journal of Production Planning and control, Vol. 2, No. 1 (1991), 73-85.  
  5. Gunasekaran, A., Goyal, S. K., Subash Babu, A. and Ramaswamy, N., "Optimization of a Multi-stage Production-inventory System with Significant Setup-operations Time", International Journal of Systems Science, Vol. 22, No. 2 (1991), 293-312.

(1990)    

  1. Goyal, S. K. and Gunasekaran, A., "Effect of Dynamics Process Quality Control on the Economics of Production", International Journal of Operations & Production Management, Vol. 10, No. 7 (1990), 69-77.  
  2. Gunasekaran, A., Subash Babu, A. and Ramaswamy, N., "Lot-sizing in a Class of Multi-stage Production-inventory Systems ", International Journal of Systems Science, Vol. 21, No. 11 (1990), 2287-2303.  
  3. Gunasekaran, A., Subash Babu, A. and Ramaswamy, N., "Machine Assignment Policies in a Multi-stage Multi-Facility and Multi-Product Production-inventory Systems", International Journal of Systems Science, Vol. 21, No.11 (1990), 2305-2315.  
  4. Goyal, S.K. and Gunasekaran, A., "Multi-Stage Production-Inventory Systems", European Journal Operational Research, Vol. 46, No. 6 (1990), 1-20.  

(1988)    

  1. Gunasekaran, A., Subash Babu, A. and Ramaswamy, N., "Analysis of Inventory Policies in an Integrated Production-inventory System with Decaying Materials", International Journal of Systems Science, Vol. 19, No. 2 (1988), 227-239.  
  2. Gunasekaran, A., Subash Babu, A. and Ramaswamy, N., "The Behaviour of a Production-inventory System for Varying Marketing Decisions",International Journal of Systems Science, Vol. 19, No. 2 (1988), 241-250.   

(1985)    

  1. Gunasekaran, A., "A Study of Demand Variations in a Production-inventory System Based on the Cost Aspects Using Statistical Analysis", Modelling, Simulation and Control C. AMSC Press, Vol. 3, No. 1 (1985), 11-29.  
  2. Gunasekaran, A., "A Study of Emergency Order Process Starting Time in Single-stage Multi-product Production-inventory System", Modelling, Simulation and Control C. AMSC Press, Vol. 2, No. 2 (1985), 7-23.  

(1984) 

  1. Gunasekaran, A., "A Study of Turn-Over Rate of a Production System Considering the Value of Products", IFIP Global Modelling Conference, Buenos Aires, Argentina, 1984 (in absentia).
  2. Gunasekaran, A., "Application of Aggregate Production Planning Models in Developing Countries: An Analysis", International Seminar on Algorithms for Production Control and Scheduling, Karlovy Vary, Czechoslovakia, 1984 (in absentia).
  3. Gunasekaran, A., Subash Babu, A. and Ramaswamy, N., "A Model for Multi-stage Multi-facility and Multi-product Production-inventory System",International Quarterly Journal of Engineering Production, Vol. 7, No. 2 (1984), 80-91.

QuickLinks

x

+