Feature Stories 2016: Capstone Project: Sandblasting Optimization

Justin DaRosa, Tim Kramer, John Bui
Feature Stories 2016: Capstone Project: Sandblasting Optimization
Capstone Project: Sandblasting Optimization

Students determined that a static electricity charge created by sandblasting caused the blasting grit to cling to the product in the machine, thus causing process problems later and also causing an unsafe working condition for employees. They selected, installed, and configured a system to eliminate the static charges, thus solving the problem.

Faculty advisor:

Dr. Sankha Bhowmick

Team:

Justin DaRosa (leader), Mechanical Engineering
Tim Kramer, Mechanical Engineering
John Bui, Mechanical Engineering

Sponsor:

CPS Technologies

Abstract:

Students determined that a static electricity charge created by sandblasting caused the blasting grit to cling to the product in the machine, thus causing process problems later and also causing an unsafe working condition for employees. They selected, installed, and configured a system to eliminate the static charges, thus solving the problem.

More information

Department of Mechanical Engineering